Professional construction estimating
Precision estimates.Delivered with confidence.
AI-Assisted Drawing Intelligence combined with expert human review. Quantity takeoff, BOQ preparation and professional cost estimating for construction projects.
- AI-assisted
- Human reviewed
- Controlled calculation
We work from
- Architectural drawings
- Structural drawings
- MEP drawings
- Civil drawings
- Specifications
- Tender documents
Platform capabilities
Built for the way estimators work
Every quantity starts on a drawing. We keep the link between the measurement, its unit and its source sheet, so the estimate can be checked line by line.
AI-Assisted Drawing Intelligence
Helps identify elements and information on construction drawings, for the estimator to check — never a final answer on its own.
Structured quantification
Quantities carry their units, element references and the drawing they were measured from.
Controlled calculation
Explicit quantities, units and controlled rates, with the calculation inputs kept visible.
Human review
A professional estimator reviews every output before it is issued.
Sheet A-101 · Ground floor plan · Takeoff layer
Illustrative ExampleServices
Seven estimating services, one structured method
From the first measured quantity to a tender-ready estimate, each service follows the same drawing-to-review workflow.
- 01
Quantity Takeoff
Quantities measured from drawings and specifications, organised by element with units and drawing references.
Typical output: Quantity schedule
- 02
BOQ Preparation
Bills of Quantities structured into work sections, with clear item descriptions, units and quantities.
Typical output: Bill of Quantities
- 03
Construction Cost Estimating
Cost estimates built up from measured quantities and explicit rates, with the calculation inputs kept visible for review.
Typical output: Cost estimate
- 04
Commercial Estimating
Estimating for commercial building projects, structured by trade and work section.
Typical output: Trade-structured estimate
- 05
Material Takeoff
Material schedules derived from the drawings, listing each material with its unit and quantity.
Typical output: Material schedule
- 06
Specialist Estimating
Estimating for specialist trades and packages that need discipline-specific measurement.
Typical output: Package estimate
- 07
Tender Estimating
Quantities and estimates prepared to support tender submissions, with scope assumptions recorded.
Typical output: Tender estimate pack
How it works
From drawings to a reviewed estimate
Six stages, in a fixed order. Technology assists the early stages; an estimator is responsible for the result.
01
Drawing
Drawings, specifications and tender documents are received and registered against the project.
02
Intelligence
AI-Assisted Drawing Intelligence highlights elements and information for the estimator to verify.
03
Takeoff
Quantities are measured with units and drawing references.
04
BOQ
Measured items are organised into a structured bill of quantities.
05
Estimate
Explicit, controlled rates are applied to the measured quantities.
06
Review
An estimator reviews the result for context and completeness before issue.
Why Estimators Club
Technology that supports the estimator — not one that replaces them
AI-assisted, not autonomous
Drawing intelligence supports the estimator. It does not replace professional judgement.
Human reviewed
Outputs are reviewed by an estimator for context, scope and completeness.
Structured
Quantities, calculations and estimate structure are organised consistently.
Traceable
Each figure can be followed back to its quantity, unit and source drawing.
Project types
- Residential
- Commercial
- Industrial
- Healthcare
- Education
- Hospitality
Residential, commercial and institutional buildings, measured from the project's own drawings and specifications.
Illustrative examples
What structured outputs look like
Two extracts from one illustrative building, continuing the takeoff shown above. They show structure only — they are not real project data.
Quantity Takeoff
Quantity schedule — Sheet A-101
| Ref | Description | Unit | Qty | Drawing |
|---|---|---|---|---|
| W-01 | External wall, cavity construction — length | m | 16.00 | A-101 |
| A-03 | Floor finish, ceramic tile | m² | 44.80 | A-101 |
| D-01–03 | Internal door sets | nr | 3 | A-101 |
| F-01 | Strip foundation, concrete | m³ | 9.60 | S-201 |
BOQ Preparation
Bill of Quantities — extract
| Item | Description | Unit | Qty | Rate |
|---|---|---|---|---|
| E — Masonry | ||||
| E.1 | Cavity wall, 2.60 m high (W-01) | m² | 41.60 | — |
| E.2 | Lintels over openings | nr | 3 | — |
| M — Floor finishes | ||||
| M.1 | Ceramic floor tiling (A-03) | m² | 44.80 | — |
| M.2 | Skirting to perimeter (A-03) | m | 27.20 | — |
Start from the drawings
Structured quantities. Controlled calculation. Human review.
See which of the seven services fits your project, and how each one moves from drawing to reviewed estimate.