Service 05 / 07
Material Takeoff
Material schedules taken from the drawings. Each material is identified, tagged, measured in its own unit and traced to the sheet it came from.
- Output
- Material schedule
- Workflow
- Covers Drawing, Intelligence, Takeoff, then human review.
Material schedule
| Tag | Material | Qty |
|---|---|---|
| BLK | Blockwork | 41.60 m² |
| INS | Insulation | 41.60 m² |
| BRD | Lining board | 41.60 m² |
| DPC | Damp-proof course | 16.00 m |
| CON | Foundation concrete | 3.84 m³ |
Grouped by package · source A-310
What it does
Every material identified, measured and listed
A material takeoff lists what the drawings call for, one material at a time. Each material is identified from the drawings and specification, tagged, and measured in its own unit: m, m², m³, kg or nr.
The schedule is grouped by trade or package, with a drawing reference on every line. It can be checked against the drawings, then used for pricing or procurement planning.
- TAGIdentification
- Each material named and tagged
- UNITUnits
- m, m², m³, kg or nr, as the material needs
- QTYQuantities
- Measured per layer and element
- PKGPackages
- Grouped by trade or package
- SPECSpecification links
- Descriptions taken from the specification
- SHEETDrawing references
- Source sheet on every line
Inputs
What we work from
The project's own documents. Core inputs are needed for this service; the others are used where the project has them.
Construction details
CoreBuild-ups, layers and junctions.
Architectural drawings
CorePlans, sections and elevations.
Specifications
CoreNames and describes each material.
Structural drawings
Where relevantConcrete and reinforcement.
Schedules
Where relevantFinishes, doors and ironmongery.
Workflow
From build-up to material schedule
Materials are confirmed against the specification before they are measured, and each layer is measured only once.
- Estimator
- AI-assisted suggestion
- Controlled calculation
- Human review
- 01
Drawing
Read the build-ups
Details and sections show what each element is made of.
Who: Estimator
- 02
Intelligence
Identify materials
AI-Assisted Drawing Intelligence highlights possible materials. The estimator confirms each one.
Who: AI-assisted suggestion
- 03
Takeoff
Tag
Each confirmed material gets a tag and its unit.
Who: Estimator
- 04
Takeoff
Measure
Each layer and element is measured in its unit.
Who: Estimator
- 05
Takeoff
Schedule
Materials are grouped by trade or package, with references.
Who: Estimator
- 06
Review
Review
The schedule is checked against the drawings and specification.
Who: Human review
Deliverable
Material schedule
Each material is listed with its tag, unit, quantity and the sheet it was measured from.
Every output includes
- Material tag and description
- Unit and quantity
- Trade or package grouping
- Source sheet and revision
| Tag | Material | Unit | Qty | |
|---|---|---|---|---|
| Package · Masonry | ||||
| BLK | Blockwork, 100 mmA-310 | m² | 41.60 | |
| DPC | Damp-proof courseA-310 | m | 16.00 | |
| Package · Insulation and linings | ||||
| INS | Insulation, 100 mm · Rev BA-310 | m² | 41.60 | |
| BRD | Lining board, 12.5 mmA-310 | m² | 41.60 | |
| Package · Groundworks | ||||
| CON | Foundation concrete · 16.00 × 0.60 × 0.40S-101 | m³ | 3.84 | |
Checked and traceable
Checked against the drawings and the specification
A material schedule is only useful when each line can be found on the drawings.
Checked before issue
- 01Each material confirmed against the specification
- 02Unit suits the material
- 03Layers measured once, not double-counted
- 04Drawing reference on every line
- 05Schedule reviewed before issue
One line followed back to its source, and one drawing revision handled. Neither is real project data.
Illustrative ExampleSource
A-310 · Wall detail · Rev B
Layer
Layer 2 · Insulation
Tag
INS
Measurement
16.00 m × 2.60 m
Schedule line
41.60 m²
State
Reviewed
Was 75 mm · Rev A
changed to 100 mm · Rev B
The specification change is flagged and the line re-checked. The area is unchanged.
Material Takeoff
Know what the drawings call for
A material schedule starts from measured quantities. See how quantity takeoff measures every element on the drawings.
Related services
Output · Quantity schedule
Quantity TakeoffQuantities measured from drawings and specifications, organised by element with units and drawing references.
Output · Package estimate
Specialist EstimatingEstimating for specialist trades and packages that need discipline-specific measurement.
Output · Cost estimate
Construction Cost EstimatingCost estimates built up from measured quantities and explicit rates, with the calculation inputs kept visible for review.