How it works
From construction drawings to a reviewed estimate
Eight stages, each with a named owner. AI-Assisted Drawing Intelligence can highlight what is on the drawings; an estimator verifies it, measures, structures and checks the work, and reviews every output before it is issued.
- AI-assisted, verified
- Controlled calculation
- Human reviewed
- 01DrawingsWho: Estimator
- 02ReviewWho: Estimator
- 03Drawing intelligenceWho: AI-assisted · estimator verifies
- 04TakeoffWho: Estimator
- 05StructureWho: Estimator
- 06CalculationWho: Controlled calculation
- 07ReviewWho: Human review
- 08DeliverableWho: Estimator
01 · What we work from
The project's own drawings and documents
Every quantity starts on a drawing. Which documents matter depends on the service: a quantity takeoff needs the plans and specification, a specialist package its discipline drawings, a tender the full issued set.
Before anything is measured, each sheet is registered with its title and revision.
| Sheet | Title | Rev | |
|---|---|---|---|
| A-101 | Ground floor plan | Rev B | Takeoff |
| A-200 | Front elevation | Rev B | Trade scope |
| A-301 | Wall section | Rev B | BOQ items |
| A-310 | Wall detail | Rev B | Materials |
| M-101 | Ventilation layout | Rev B | Package |
Architectural drawings
Plans, sections and elevations.
Structural drawings
Foundations, frames and slabs.
Building services drawings
Discipline layouts for specialist packages.
Construction details
Build-ups, layers and junctions.
Specifications
What each element is and how it is described.
Schedules
Door, window, finishes and equipment schedules.
Tender documents
Instructions, addenda and any pricing documents issued.
Existing takeoff
Measured quantities to structure or check, where applicable.
Step by step
Eight stages, and who is responsible for each
Technology assists one stage and calculates another. People own the rest — and nothing reaches an output without an estimator's review.
- Estimator
- AI-assisted suggestion
- Controlled calculation
- Human review
- 01
Drawing stage
Receive and register
The drawings and documents are listed by sheet, title and revision, so every later figure has a known source.
- Who
- Estimator
- Produces
- Drawing register
- 02
Drawing stage
Understand the scope
The estimator reads the set for scope, checks each scale and raises gaps or ambiguities as queries before measuring.
- Who
- Estimator
- Produces
- Scope notes and queries
- 03
Intelligence stage
Drawing intelligence
AI-Assisted Drawing Intelligence can highlight walls, rooms, openings and symbols. Each suggestion stays unconfirmed until the estimator checks it.
- Who
- AI-assisted · estimator verifies
- Produces
- Suggestions to verify
- 04
Takeoff stage
Measure
Confirmed elements are measured as lengths, areas, volumes or counts, each with its unit and drawing reference.
- Who
- Estimator
- Produces
- Measured quantities
- 05
BOQ stage
Structure the quantities
Measured quantities are organised into work sections and described items, with units and references kept.
- Who
- Estimator
- Produces
- Structured items
- 06
Estimate stage
Calculate
Where the service includes an estimate, each item is multiplied by an explicit rate from the controlled rate set, and lines roll up into totals.
- Who
- Controlled calculation
- Produces
- Estimate build-up
- 07
Review stage
Validate and review
Units, sources and rates are checked, every line is traced to its sheet, and an estimator reviews the result for scope and completeness.
- Who
- Human review
- Produces
- Review record
- 08
Review stage
Deliver
The reviewed output is issued with its drawing references, queries and recorded assumptions.
- Who
- Estimator
- Produces
- Reviewed output
03 · Drawing intelligence
AI-Assisted Drawing Intelligence: it suggests, the estimator decides
On a drawing, AI-Assisted Drawing Intelligence can highlight elements and information worth checking. It is a starting point for the estimator, not a result.
What it does
- Highlights walls, rooms, openings and symbols on a drawing
- Surfaces information for the estimator to look at
- Leaves every suggestion unconfirmed until it is checked
What it does not do
- Measure or issue quantities on its own
- Decide what is in scope
- Set rates or make commercial decisions
- Replace the estimator's review
Sheet A-101 · before and after
Illustrative ExampleBefore · as received
After · suggestions to verify
| Ref | Estimator | Result | |
|---|---|---|---|
| S-01 | Wall | Confirmed | W-01 · External wallSuggested: Wall |
| S-02 | Room | Confirmed | A-03 · Room floorSuggested: Room |
| S-03 | Door | Confirmed | D-01 · Door setSuggested: Door |
| S-04 | Door | Corrected | A window, not a doorSuggested: Door |
| S-05 | Fixture | Rejected | Furniture — not measuredSuggested: Fixture |
04 · Measurement
Four kinds of quantity, each with its source
Whatever is measured — a length, an area, a volume or a count — the record keeps the drawing, the dimensions, the unit and whether it has been checked.
Length
m- Ref
- W-01 · External wall run
- Drawing
- A-101 · Rev B
- Dimension
- 16.00
- Quantity
- 16.00 m
- State
- Reviewed
Area
m²- Ref
- A-03 · Room floor
- Drawing
- A-101 · Rev B
- Dimension
- 8.00 × 5.60
- Quantity
- 44.80 m²
- State
- Reviewed
Volume
m³- Ref
- CON · Foundation concrete
- Drawing
- S-101 · Rev B
- Dimension
- 16.00 × 0.60 × 0.40
- Quantity
- 3.84 m³
- State
- Confirmed
Count
nr- Ref
- D-01–03 · Internal door sets
- Drawing
- A-101 · Rev B
- Dimension
- 3 × 1
- Quantity
- 3 nr
- State
- Re-counted
05 · Structure
Measured work, organised into sections and items
Quantities become described items under work sections. Each item keeps its reference, description, unit, quantity and the drawing it was measured from — the same structure as a quantity schedule or bill of quantities.
Quantities to items
| Measured | Qty | Bill item | |
|---|---|---|---|
| W-01 | 41.60 m² | E.1Blockwork wall | |
| Lintels | 3 nr | E.2Lintels over openings | |
| A-03 | 44.80 m² | M.1Floor finish | |
| F-01 | 27.20 m | M.2Skirting |
E · MasonryWork section
- Item
- E.1
- Description
- Blockwork wall, 100 mm, external wall W-01
- Unit
- m²
- Quantity
- 41.60
- Drawing ref.
- A-301 · Rev B
- Item — Reference under its section
- Description — Written from the drawings and specification
- Unit — Stated, never inferred
- Quantity — 16.00 × 2.60, measured
- Drawing ref. — Where it was measured
06 · Calculation
Controlled calculation, with the working shown
Where a service includes an estimate, each figure is built from an explicit quantity, its unit, a stated formula and a rate from the project's controlled rate set.
Calculation chain · item E.1
Illustrative Example- 1
Quantity
41.60
Measured from W-01
- 2
Unit
m²
Carried with the quantity
- 3
Formula
qty × rate
Stated for the item
- 4
Controlled rate
rate E.1
Explicit input from the rate set
- 5
Cost
cost E.1
41.60 m² × rate E.1
- 6
Total
Σ section E
Rolls up to the estimate
- 7
Validation
- Unit match
- Source recorded
- Rate source
- Reviewed
07 · Review and traceability
Any figure can be followed back to the drawing
Review checks the output against its sources. Revisions, open questions and assumptions are recorded, so the basis of every figure is stated.
One item, traced
Illustrative ExampleSource drawing
A-301
Wall section · Rev B
Item
E.1
Blockwork wall
Quantity
41.60 m²
16.00 × 2.60 · W-01
Output
BOQ-01
Section E · line E.1
Review
Reviewed
Estimator sign-off
Recorded alongside the output
Was 39.52 m² · Rev A
changed to 41.60 m² · Rev B
The item quantity follows the re-measured wall. The description and reference are unchanged.
Lintel detail not shown on the wall section.
A-301 · affects item E.2
Typical lintel detail assumed until Q-02 is answered.
Recorded with the estimate
08 · Deliverables
What you receive
Each service ends in a defined, reviewed output. The sheets show document structure only — each links to a worked illustrative example.
QT-A101
Quantity schedule
- Quantity and unit per line
- Source sheet and revision
BOQ-01
Bill of Quantities
- Work sections and items
- Descriptions, units and quantities
MS-01
Material schedule
- Material tags and units
- Package grouping
ES-01
Cost estimate
- Quantity × named rate per line
- Section and estimate totals
PK-01
Package estimate
- Measured runs and counts
- Scope boundary and by-others list
TD-01
Tender estimate pack
- Quantities and estimate
- Queries, assumptions and exclusions
See it applied
Follow the workflow through six worked examples
Each illustrative example takes one input through the process to a reviewed output — or compare the seven services to find the one that fits your drawings.